Parker High School

Parker High School offers a flex scheduling option to its students. The architecture, allowing the facility to be in use from 7:00 am until 10:00 pm, was specifically designed to work with that system. It includes partnership spaces for use by the local community college, business partners and training programs. The design features two separate structures, an academic building and a fieldhouse unified by a circulation spine or “knowledge mall”. The academic building features 6 academies, a twostory media center, dining commons, staff-less school store, and a theater/fine arts zone. A covered walk leads to the athletic building, which houses a gymnasium, natatorium, two weight/nautilus rooms, an athletic field with synthetic running track, and a stadium with grandstands built into the side of the fieldhouse.

Project Details:

Project Name:
Parker High School
Client:
Howell Public Schools
Location:
Howell, MI
Cost:
$52,000,000
Sq Ft:
300,000
Completed:
2007
Project Summary:
pdf-ico